Project case study

NECA Office Lighting Upgrade with Energetic Lighting and NSG Boffa

Adelaide, SA15 November 2023

Energetic Lighting worked with NECA SA/NT and NSG Boffa to replace the office's fluorescent lighting with 82 new LED fittings.

The installation included 60 Destiny Plus panels, six low-UGR TriValite Pro downlights in the reception and 16 Tempest V weatherproof IP65 battens in the car park and stairwell. The upgrade improved office light levels while reducing future energy and maintenance costs.

Download the case study

Products used in this project