Project case study

A Vibrant Future: Cutting-Edge Lighting Solutions at the RDO Equipment Facility

Charlton, QLD21 February 2025

The RDO Equipment Facility at Charlton in Queensland opened in September 2024. The state-of-the-art distribution and service centre includes a 24-bay workshop, paint booth, fabrication centre, training areas and parts storage.

Project outcomes

  • Design conformity: fittings met the functional and aesthetic brief.
  • Cost-effective delivery: the scheme balanced performance, installation time and project budget.
  • Performance compliance: the completed design met the required lux levels under Section J6 of the Building Code.

Products and features

Around 900 flicker-free fittings were deployed. Destiny Plus panels were used in offices and meeting rooms; Legolite downlights and Ledway emergency lights served office and breakout areas; Falcon highbays illuminated the warehouse; TriValite Pro downlights were installed in kitchenettes and recreation areas; and Storm area lights covered the outdoor car park.

Conclusion

The collaboration between RDO Equipment Facility, NRG Services QLD, GFG Projects and Energetic Lighting delivered a safe, efficient and contemporary facility with a lighting system designed for long-term reliability.

Products used in this project